General Contracting Projects

112 Lakeview Office Park
Thousand Oaks, California
Demolition, removal and replacement of approximately 11,000 sf of main building entry and tenant patio areas with new linear pavers, extensive landscaping and lighting, and glass and stainless steel handrailings

Swiss Re Insurance
Westlake Village, California
Complete strip-out and installation of approximately 32,000 sf of tenant improvements for a major international insurance company. Work included extensive cabling and secure teleconferencing facilities to maintain 24 hour global communication with satellite offices.

Park Place Office Campus
Irvine, California
Extensive renovation of 2 million sf office campus under multi-year fixed price contracts including new common areas, elevator lobbies, corridors and restrooms, entrances, office and assembly areas, and a new central restaurant and dining areas

Doheny Eye Center
Los Angeles, California
Interior remodel of existing space, examination rooms and administrative area.

Lakewood Regional Medical Center
Lakewood, California
2nd floor remodel and renovation, conversion to Sub-Acute & Dual Diagnostic Unit.

Garfield MOB 11 Cancer Center Remodel
Monterey Park, California
Interior renovation for outpatient cancer treatment including examination, treatment and radiology facilities.

Turbo Tires
Irwindale, CA
Renovation of a 280K square foot industrial and office space for a wholesale tire company.  This project included a 50K square foot structural mezzanine removal, roof strengthening and complete fire sprinkler system.

National Geographic Films Division
Beverly Hills, CA
Phased two-part project on Wilshire Blvd in L.A. included building 5,500 sf of new upscale office space with high speed data capability, relocating existing office personnel, and then stripping out the interiors of the existing 6,000 sf office space and rebuilding that space to match.  This project enabled National Geographic to double its office space, expand into new space, and avoid a single lost time day. Total interior construction 11,500 sf performed under a fixed fee design-build agreement.

Winona Office Building
Burbank, CA
120,000 sf data center complete interior non-structural demolition and clean out. Recreated 900 sf class A lobby and elevator core, new entrance with enhanced paving, glazing, stainless handrails, alucabond façade, and parking lot restoration.

Ficus St.
Pomona, CA
280,000 sf industrial distribution building.  Complete interior demolition including 50,000 sf mechanical and structural mezzanine and  equipment removal.  Constructed  1,500 sf spec luxury office space and complete  upgrade of entry with new parking for 220 cars, new pre-cast concrete entrance elements, and enhanced paving and glazing materials.

Alton East Technical Center
Irvine, CA
180,000 SF high tech spaces, 3 buildings with glass and aluminum curtain wall.

Vintage Golf Clubhouse
Indian Wells, CA
110,00 SF luxury golf clubhouse including full dining, locker facility and pro shop.

USC/University Hospital
Los Angeles, CA
Extensive modifications required for the installation of an Angio Bi plane Neuro
Vascular Machine
Renovation at 4 floors to create infectious disease isolation rooms

Nordstrom Distribution Center
Ontario, CA
115,000 SF distribution Facility, tilt up construction

Orange Bakery Display Facility
Irvine, Ca.
Installation of a 22,000 sf operating bakery facility including conference and display areas for a bakery equipment manufacturing company

Lake Arrowhead Village
Theme retail and entertainment project consisting of extensive site improvements, nine separate retail buildings and concrete parking structure built in Lake Arrowhead, Ca.

Mile Square Golf Course
Fountain Valley, CA
Remodel of 22,000 sf golf clubhouse, cart storage buildings, 580 car parking lot

Kline Center Phase I & 11
Ontario, CA
80,000 and 56,000 SF, Type V office buildings, brick skin and related sitework.

Segerstrom High Tech 14
Costa Mesa, CA
60,000 SF, 2 story office and corporate headquarters

Kalele Kai Luxury Condominiums
219 unit waterfront condominium project consisting of 3   6 story buildings, 10 townhouse dwellings, a clubhouse and poolside amenities with subterranean parking for 500 cars.

Kona Coast Shopping Center
Renovation of 100,000 SF retail center, expansion of parking area and 3,000 SF building addition.

Hawaii Kai Executive Plaza
62,000 SF, 2 story office building with elevator features and interior courtyard with ornamental water feature and atrium landscaping; scope of work also includes 7,000 SF restaurant pad, offsite and onsite improvements.

Coldwater Canyon Villas
North Hollywood, CA
56 unit condominium complex with recreational common area

Antelope Valley Hospital
Lancaster, CA
Renovation of nursing floor into pediatric intensive care unit

Waikele Golf Clubhouse
Plantation theme 22,000 sf golf clubhouse, cart storage, dining facilities, pro shop


Construction Management Assignments

Douglas Center
Long Beach, CA
Twin 500,000 SF, 9  and 7 story office buildings with 50,000 SF retail and 2,200 stalls, 6  parking garage, shell construction through tenant build out.

Huntington Beach Office Park
Huntington Beach, CA
240,000 SF, 9 story office building and site improvements, shell construction through tenant build out.

Desert Hills Factory Stores
Cabazon, CA
210,000 SF factory outlet shopping center, 45 acres of onsite improvements, extensive infrastructure, utility relocation, retaining walls, and offsite improvements.

Newport Lido Medical Center
Newport Beach, CA
Pre-construction estimating and scheduling work for 90,000 SF, 5 story medical office building with 300,000 SF subterranean parking.

Newport Landing
Newport Beach, CA
30,000 SF retail center and restaurant facility on Balboa Peninsula, involved extensive dewatering and marine piling. Included four level parking garages.

Carlisle Retirement Hotel
San Francisco, CA
Pre construction services on ten story retirement facility. Included cost estimating services, value engineering, scheduling studies, and construction contract negotiation.

Breakers Hotel
Long Beach, CA
Feasibility Studies, cost estimating, and value engineering for the seismic renovation and conversion into a retirement facility of this historic building in Long Beach.